wes
KIllerfrog Emeritus
This area is not viewable via the construction cameras. It is due for a near 1,000 yard concrete pour on Saturday.
This area makes up the service level, the visiting team level and operations. The sloped areas are the ramps to move up and down between levels.
Thanks to Ross Bailey for providing these
This area makes up the service level, the visiting team level and operations. The sloped areas are the ramps to move up and down between levels.
Thanks to Ross Bailey for providing these