Have heard they are right on time. This must be bogus because the west side is no where near to what the April 1st timeline picture shows here.

http://www.stadium.tcu.edu/timeline.asp
 

frogs9497

Full Member
They're further along with the north EZ than the picture indicates for April 1.

But it does look like they're behind schedule overall.
 

IamFroglash88

New Member
I have a feeling that when they finish the NW Corner basement area and start erecting the pillars above ground level, things are going to move very quickly.
 

Dr. Coach Haus

Active Member
They built the stadium in the right order. They need the North endzone for the next season. If that is done, then they do not have worry about displacing people again. Plus they can keep working on the rest of the stadium during the season.
 
Unless they are taking out the catwalk between west and north, that is a different drawing. and the tunnels are to close together. Its a quick drawing and not close to the actuall design. Looks like this was made when the first draft was submitted, then the design changed a bit.
 