The city of FW permitting process has to be the biggest cluster in all the bureaucracy that runs this city.
Just trying to build a storage shed with a room attached to it to use as a backyard office and they want me to get every sort of engineering and permit and inspection and diagram and certification just short of a dna test and full tax audit and colorectal exam. Just so they can say “yes you can build a 280sf storage shed on the property you own.”
I have a pretty long fuse but these clowns in permitting have been trying me. Adding to this is that every submittal I do takes 7 to 10 days before it gets a ‘rejection due to [arbitrary reasons].’
F permitting. I’m not trying to open a bar in my back yard. I need a place to put my lawnmower and guitar cases!